2011 Road Reserve Study

The 2011 Road Reserve Study has been completed and the reserve amount needed to be saved each year has been identified. Items included in the reserve study are as follows:
- Concrete curbing
- Asphalt street overlay (road replacement), phased replacement
- Asphalt seal coating
- Asphalt sidewalk overlay (sidewalk along Green Road)
- Detention pond and outlets cleaning - silt removal
- Streetlight pole replacement, phased replacement
- Fence replacement (fence along Green Road)
Click on the link to view the full 2011 Road Reserve Study.